This popular care home needed to increase the accessibility of its ground floor toilet facilities for residents and visitors. They had a room that provided 2 toilet cubicles, it needed to be converted to provide a fully accessible facility.
We took time to understand their requirements around access, safety and hygiene which enabled us to produce a plan to convert the space using the Altro Whiterock system. This system can be used to create moisture-sealed hygienic bathroom areas. The floor is prepared and the walls sealed before Altro safety flooring and Whiterock wall cladding is installed. This system ensures there are no seams between the floor and the wall where harmful bacteria can hide and breed, providing a slick, clean environment that is easy to clean.
A project timeline was created to ensure speed of installation whilst delivering a high-quality finish. After the removal of the old fixtures and fittings, a stud wall and boxing were installed to hide the existing pipework, the electrics and plumbing was then ‘first fixed’. The Artex walls were sealed, and it wasn’t long before the floor was ready to latex, creating a perfectly prepared level floor. Once the latex was dry and cured the Altro anti-slip safety flooring was installed. The flooring was continued up the wall forming a rounded angle skirting known as ‘coving’, providing a hygienic, safe and easy to clean detail. The Whiterock sheets were heated and thermoformed into the corners and angles of the room, all joints hot welded to provide that hygienic slick finish. Once the floor and walls were complete a suspended ceiling was installed, high gloss wipeable ceiling tiles were used to complete the look. Lowering the ceiling height has really enhanced the space and provides easy access to the void above if required. The ceiling is made complete with a new extractor fan, light senor and light fitting which removes the need to install light pulls or switches keeping the focus on hygiene and making it safer for staff who are supporting residents using the facilities. The final part of the project is to get the new accessible toilet and fixtures in place and secure.
The project was finished within 7 days, creating a bright and colourful space, whilst also being a safe and hygienic facility for residents and visitors. It’s wonderful for us to be part of these dramatic transformations which we know will help our client’s deliver their best services. This bathroom is now hygienic and easy to clean, with no ongoing maintenance requirements. Our clients were so pleased with the results that we have already been commissioned to complete 10 more room transformations for them.
Undertaking this project in an operational care home presented a few challenges for the team, these included:
We’re here to help! Whether it’s a quick fix or a full-scale property upgrade, our team is ready to assist. Get in touch today – let’s keep your property in top shape!
Call Us
Email Us
Address
Head Office:
SAB Group, Ground Floor, Vanquish House, Wellesley Road, Tharston, Norwich, NR15 2PD.
Workshop:
Richmond Close, Honingham, Norwich, Norfolk. NR9 5BP